Skip to content
  • +
  • Projects
  • Office
  • Expertise
  • Contact
  • +
  • Projects
  • Office
  • Expertise
  • Contact

CNEN | Montrouge

New Commercial Building

  • Office

About this project

Part of EDF Energy, the CNEN is an engineering division that employs nearly 1,000 people. The project is composed of three 6-storey buildings. The office floors as well as the canteen on the ground floor offer a beautiful view on the private landscape garden. The office spaces overlooking the garden are freely adaptable and convertible thanks to their large modular structure that allows for the creation of partitions when needed. Last but not least, a bioclimatic design approach was employed to promote natural light, control solar gain and ensure acoustic comfort. For all these reasons, the project has been awarded both BBC and HEQ labels.

Facts and figures​

ClientQuartus
ArchitectaaPGR + LS Architectes
Area24,500 m2
Value€ 55M
Appointment2013
Completion2016

Project complexities​

  • Technical constraints
  • Third-party and shareholders strong involvement
  • Strict contract conditions
  • Fast-track programme constraints
  • Budget constraints
  • Change constraints

Gallery

Our role

We were appointed during the ‘Pre Contract’ phase to provide ‘Cost Management’ for the construction of the CNEN building in Montrouge designed by aaPGR + LS Architectes. The project was administered and delivered under a single contract within a 32-month execution programme. Our involvement encompassed direct and indirect management of enabling works, construction, equipment, security installations, external works, landscaping and general attendances. The services we procured included, but were not limited to, the following:

Cost Management

  • Feasibility studies, benchmarking, financial advice and budget preparation
  • Valuing existing assets and preparation of Reinstatement Cost Assessment (RCA) for insurance purposes
  • Establishment of the procurement strategy
  • Preparation of tender document (contracts, written specifications and bill of quantities)
  • Evaluation, clarification, negotiation, realignment of tenders and finalising contracts
  • Cost monitoring and reporting
Meet our team

Location

97 Avenue Pierre Brossolette, Montrouge, France

More projects

Health

Centre Soins-Études | Sablé-sur-Sarthe

Based on the site of the former Sablé-sur-Sarthe hospital, the operation consisted in rehabilitating the vacant premises. The goal was to give birth to a

Health

Foyer d’Accueil Médicalisé | Créteil

The project consisted in the construction of a Medical home as well as a Special care nursing home hosting 45 adults diagnosed with ‘Autism Spectrum

Primary contact

Loading...

Thomas Thevenot

French Riviera, France

+33(0)7 81 23 24 78
Thomas@neuronconsultancy.com

All rights reserved

Involvement of Thomas Thevenot | Facea SAS
Our Capability Statement
© 2022 Neurön SAS

Terms and conditions

Gender Pay Statement

Privacy and Cookies Policy

Modern Slavery Statement

Expertise
  • Cost Management
  • Project Management
  • Advisory
  • Cost Management
  • Project Management
  • Advisory
Language
  • English
  • Français (French)
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.OkNoPrivacy policy