Skip to content
  • +
  • Projects
  • Office
  • Expertise
  • Contact
  • +
  • Projects
  • Office
  • Expertise
  • Contact

Centre Aquatique Pierre De Coubertin | Cannes

New Aquatic Centre

  • Sport and Culture

About this project

Located at the edge of a parcel, Pierre de Coubertin swimming centre is arranged so as have the front to face the public paths and clearly delimit the public space. Inside, the centre revolves around its "sports hall". The 50 x 25 m outdoor Olympic pool is provided with movable wall and floor (over 20 cm) and a seating capacity of 900 seats. Next to the pool, a 500-m2 "leisure hall" under a pergola and with a retractable roof; a 100-m2 paddling pool and various recreational equipment. To heat the pools, the centre uses dual energy heating (gas and wood) as well as solar panels.

Facts and figures​

ClientVille de Cannes
ArchitectBerthomieu
Area5,400 m2
Value€ 16M
Appointment2011
Completion2013

Project complexities​

  • Design constraints
  • Technical constraints
  • Third-party and shareholders strong involvement
  • Strict contract conditions
  • Social challenges
  • Careful use of public monies

Gallery

Our role

We were appointed during the ‘Pre Contract’ phase to provide ‘Project Control & Advisory’ for the construction of the new aquatic centre ‘Pierre de Coubertin’ designed by Berthomieu. The project was administered and delivered under a single contract within a -month execution programme. Our involvement encompassed direct and indirect management of enabling works, construction, furniture, equipment, professional fees, security installations, external works, landscaping and general attendances. The services we procured included, but were not limited to, the following:

Advisory

  • Feasibility studies, benchmarking, financial advice and budget preparation
  • Establishment of cost planning, cost control, cost reporting, procurement and payment procedures
  • Leading value engineering workshops
  • Evaluation, clarification, negotiation, realignment of tenders and finalising contracts
  • Strategic planning, project set-up
  • Contracts administration and management
Meet our team

Location

Avenue Pierre Poesi, Cannes, France

More projects

Health

Centre Soins-Études | Sablé-sur-Sarthe

Based on the site of the former Sablé-sur-Sarthe hospital, the operation consisted in rehabilitating the vacant premises. The goal was to give birth to a

Health

Foyer d’Accueil Médicalisé | Créteil

The project consisted in the construction of a Medical home as well as a Special care nursing home hosting 45 adults diagnosed with ‘Autism Spectrum

Primary contact

Loading...

Gil Pitois

Paris, France

+33(0)6 65 38 53 57
Gil@neuronconsultancy.com

All rights reserved

Involvement of Gil Pitois | Laplace SAS
Our Capability Statement
© 2022 Neurön SAS

Terms and conditions

Gender Pay Statement

Privacy and Cookies Policy

Modern Slavery Statement

Expertise
  • Cost Management
  • Project Management
  • Advisory
  • Cost Management
  • Project Management
  • Advisory
Language
  • English
  • Français (French)
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.OkNoPrivacy policy