About this project

The spiral is the central theme of the B&G design, it symbolizes movement, progress through knowledge. That is also why the new complex is not an isolated entity, but one that is open and part of the neighbourhood. A connection visible in its airy bridge-like structure allowing communication between outdoor and indoor spaces. A system of interlacing ribbon-like elements makes up the facades. Moving imperceptibly towards the interior, these elements are enhanced using different materials. City side, white textured concrete panels cover the walls, while on the inside, a gray wood cladding takes over the meanders that contain the playground.

Facts and figures​

ClientMairie de Paris
ArchitectBrenac & Gonzalez
Area15,500 m2
Value€ 34M
Appointment2010
Completion2017

Project complexities​

  • Design constraints
  • Technical constraints
  • Legal and standards constraints
  • Social challenges
  • Phased project
  • Careful use of public monies

Gallery

Our role

We were appointed during the ‘Pre Contract’ phase to provide ‘Cost Management’ for the construction of the new ‘Lycée – La Plaine’ school (680 students | 4 storey building) designed by Brenac & Gonzalez. The project was administered and delivered under a single contract within a 48-month execution programme. Our involvement encompassed direct and indirect management of enabling works, demolition, construction, equipment, security installations, external works, landscaping and general attendances. The services we procured included, but were not limited to, the following:

Cost Management

  • Feasibility studies, benchmarking, financial advice and budget preparation
  • Preparation of estimates, cost planning and cash flow forecasting
  • Establishment of the procurement strategy
  • Preparation of tender document (contracts, written specifications and bill of quantities)
  • Evaluation, clarification, negotiation, realignment of tenders and finalising contracts
  • Cost monitoring and reporting
Meet our team

Location

70 Avenue George Sand, Saint-Denis, France

More projects

Health

Centre Soins-Études | Sablé-sur-Sarthe

Based on the site of the former Sablé-sur-Sarthe hospital, the operation consisted in rehabilitating the vacant premises. The goal was to give birth to a

Health

Foyer d’Accueil Médicalisé | Créteil

The project consisted in the construction of a Medical home as well as a Special care nursing home hosting 45 adults diagnosed with ‘Autism Spectrum

Primary contact

Loading...

Thomas Thevenot

French Riviera, France

+33(0)7 81 23 24 78
Thomas@neuronconsultancy.com

All rights reserved

Involvement of Thomas Thevenot | Facea SAS
Our Capability Statement
© 2022 Neurön SAS

Terms and conditions

Gender Pay Statement

Privacy and Cookies Policy

Modern Slavery Statement

Expertise
  • Cost Management
  • Project Management
  • Advisory
  • Cost Management
  • Project Management
  • Advisory
Language
  • English
  • Français (French)
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.OkNoPrivacy policy